View Single Post
Old 12 May 2008, 04:12 AM   #29 (permalink)
drrivah
Two-seater Pilot
 
drrivah's Avatar
 
Join Date: Dec 2005
Location: Virginia
Posts: 167
 
Blast work

Hi baldeagle- Thanks for the tip. Est. is 650- to blast and epoxy fuse. Say their policy is not to powdercoat if tube frames have been linseed oiled.
-pete
drrivah is offline   Reply With Quote