View Single Post
Old 4 June 2009, 07:57 PM   #23 (permalink)
Jecull
Two-seater Pilot
 
Jecull's Avatar
 
Join Date: Jul 2008
Location: Livermore, CA
Posts: 134
 
Mummification pt. II. The top went very much like the bottom, so far. I've got more room to play this time as these pieces were a bit larger comparatively. From the port side, right side up.


Port side. It takes quite a bit of tape to hold these things on. I snapped a couple of stringers again.


Post demummification without...


& with the fin dry fitted.


Maybe I'll get to gluing these down this weekend. I've also installed the rudder & elevator servos. I'll get images of those when I get my better camera over.

-Jim
Jecull is offline