View Single Post
Old 30 June 2009, 12:41 PM #141 (permalink)
John McKenzie
Forum Ace
 
Join Date: Oct 2008
Location: Southampton U.K.
Posts: 735
 
Construction

The 1st rudder pulley assembly sits on a tapered spruce (circular) block which aligns it correctly for the cables .......(cross shaft is temporarily protected in film .)......The bracket to the left of the picture is the Front landing gear connection bracket...(see later ).....Forward is towards the right.........It was specified that the original parts were to retain their "Patina"......Splined socket has yet to be fitted....as also the bearings.
John McKenzie is offline   Reply With Quote